Hampshire Chroniclehampshire• 1 min read
Road to close for up to 11 days for utility works to take place
The closure is expected to last no longer than 11 days, although the order allows for up to six months.
Read the full story at Hampshire Chronicle
Havoc links to the original reporting — the full story stays with the publisher.
Was this worth reading?Sign in to vote