Enfield DispatchYour Borough• 4 min read
Backlog of tube maintenance works estimated at £6.5bn

Maintaining assets on the network requires annual spending of £1.2bn but expenditure has averaged just £700m in recent years
Read the full story at Enfield Dispatch
Havoc links to the original reporting — the full story stays with the publisher.
Was this worth reading?Sign in to vote